Commercial & high-end residential landscape partners — DFW Metroplex
Mon–Fri: 7:30 AM – 5 PM Lewisville, TX
Down before the ice is

Ice Melt Application That Beats the Storm to the Ground

The cheapest ice event is the one that never bonds to your pavement. Pre-treating with ice melt before the front arrives keeps walks, entries, and drive lanes workable through the storm — and keeps your property open while untreated neighbors close.

White ice melt granules spread across a commercial entry walkway before a winter storm
Timing is the whole product

Pre-Treatment Wins. Reaction Pays Retail.

DFW ice is its own beast — freezing rain and sleet that glaze surfaces in hours, not snow you push around. Once ice bonds to pavement, everything gets slower, harder, and more dangerous. Material applied ahead of the front prevents that bond, so surfaces stay wet and workable instead of sealed.

Our winter clients are on the response list before the season starts: when the forecast turns, crews treat priority zones — entries, ADA routes, steps, drive lanes — on schedule, re-apply as the event demands, and document every visit for your liability records.

On posted hours: our office runs Monday–Friday, 7:30 AM–5 PM — but winter events don’t. Ice management is dispatched on storm activation, not the office calendar: contracted properties are treated ahead of the front and through the event, whenever it lands.

  • Pre-storm application — before the bond
  • Entries, walks, steps & drives prioritized
  • Re-application through the event
  • Every visit documented
Crew spreading ice melt across a commercial entry plaza before a winter storm
Ice melt scope

Where the Material Goes and Why

Coverage planned zone by zone before the first forecast.

Pre-Storm Treatment

Material down ahead of the front — the application that prevents bonding.

Entry & Walkway Coverage

The paths every tenant, customer, and employee has to survive first.

Drive Lane & Parking Treatment

Circulation kept moving so the property functions, not just stands open.

Active-Event Re-Application

Crews back on-site as accumulation and refreeze demand.

Service Documentation

Time-stamped records of what was treated and when — your slip-and-fall defense.

Good questions

Ice Melt Questions

When do you apply ice melt — before or during a storm?

Both, and before is the one that matters most: pre-treatment keeps ice from bonding to pavement, which makes everything after easier and safer. During the event we re-apply as conditions demand, because one pass rarely survives a long freezing-rain night.

Will ice melt damage concrete or landscaping?

Used correctly — right material, right rates — risk drops to near zero. Over-application by unfamiliar crews is what stains concrete and burns bed edges. Ours apply calibrated rates, and it is one more reason the same landscape company treating your property year-round should be the one salting it.

How do we get on your winter response list?

Before winter — that is the honest answer. Standing clients get route priority, staged material, and pre-agreed coverage maps. Once a storm is on the radar, every property in DFW calls at once and capacity is spoken for.

Ready when you are

Be the Property That Stays Open

Get on the winter response list now — when the forecast turns, you’ll already be covered.